Street Repair & Maintenance

PPM is charged with the maintenance and repair of all the City’s 133 centerline miles of streets, highways, and alleys. PPM replaces deteriorated concrete streets, curbs and upheaved sidewalks caused by street trees. City crews asphalt resurface streets and alleys throughout the summer. As a preventative maintenance measure, we crack seal both asphalt and concrete pavements. Also as part of our preventative maintenance program, we chip seal some of our unimproved roadways throughout the City. Pothole filling is an ongoing operation we perform throughout the year.
Generally, they are caused by water getting into cracks in the pavement and then freezing causing the pavement to fracture. As temperatures begin to warm and the vehicle wheels drive over these areas, fragments from the pavement begin to break apart.
Cracks not sealed properly or a temporary repair was performed and has failed. It could also be a sub-grade failure that cannot support the weight of the vehicles traveling on the roadway.
Potholes on our highways and primary corridors are patched first. But if large potholes are causing significant problems in any of our roadways then they get addressed as soon as possible.
We use a premium cold mix bitumen product that is workable - that our crews can shovel - and performs well in cold temperatures.
If the weather is above 40 degrees F and it's not raining, we like to use our spray patch machine that applies an asphalt emulsion with a No. 9 size limestone aggregate to fill the pothole creating a more perminate repair. Also, when local asphalt plants open in the spring, we start filling potholes with hot mix asphalt products that perform much better for longer period of time until an asphalt overlay or resurfacing project can be performed.
Our pothole filling operation is continual throughout the year, but because of the vast amount of potholes that develop after winter, our focus is filling holes on highways and primary corridors, then we move into residential sections.
With a severe winter frost, we anticipate spending nearly $250,000 in labor and materials.